GUDRUN
Export:
PDF

-
General information
-
Picture
-
Discoveries included
Discoveries included Discovery name -
Activity status – history
Activity status – history StatusStatus fromStatus toProducing07.04.2014Approved for production16.06.201006.04.2014 -
Located in
Located in Block nameProd. licence15/3 -
Owner – current
Owner – current Owner kindOwner namePRODUCTION LICENSE -
Operatorship – current
Operatorship – current Company name -
Licensees – current
Licensees – current Company nameNation codeCompany share [%]NO36.000000NO25.000000NO24.000000NO15.000000 -
Description
Description TypeTextDate updatedDevelopmentGudrun is a field in the central part of the North Sea, 50 kilometres north of the Sleipner Øst field. The water depth is 110 metres. Gudrun was discovered in 1975, and the plan for development and operation (PDO) was approved in 2010. The field is developed with a steel jacket and a topside with process facility and living quarters. Gudrun is tied-back to the Sleipner A facility with two pipelines, one for oil and one for wet gas. A PDO exemption was granted for the discovery 15/3-9 in 2013.Production started in 2014.28.02.2023ReservoirGudrun produces oil and gas from sandstone in the Upper Jurassic Draupne Formation and the Middle Jurassic Hugin Formation. The reservoir quality in the Draupe Formation, which constitutes the main recoverable resources, is in general good. The Hugin Formation has larger variation in reservoir quality. The reservoirs lie at depths of 4,000-4,700 metres.28.02.2023Recovery strategyThe field is mainly produced by pressure depletion. In 2022, water injection started in part of the field.28.02.2023TransportUnstable oil and rich gas are transported in separate pipelines to the Sleipner A facility for further processing. Dry gas is exported via Gassled (Area D) to the market, while oil is transported to the Kårstø terminal.28.02.2023StatusProduction from Gudrun has started to decline. Work is ongoing to maximise recovery from the field by infill drilling, and additional infill targets are being matured. The facility will be operated with power from shore starting in 2023, as part of the electrification of the Utsira High area. Nearby discoveries and prospects may prove sufficient resources for development and tie-in to Gudrun.28.02.2023 -
Investments (expected)
Investments (expected) The operators future investments related to the reservers from 2022 [mill NOK 2022-kroner]. The stated investment estimate has not been corrected for possible investment sharing.2175 -
Investments (historical)
Investments (historical) Investments
[mill NOK nominal values]Sum253572021195120202129201971420182112017862016335201516692014260420134674201251272011477920101078 -
Production , saleable
Production , saleable MonthNet - oil
[mill Sm3]Net - gas
[bill Sm3]Net - condensate
[mill Sm3]Net - NGL
[mill Sm3]Net - oil equivalents
[mill Sm3]Sum19.97073013.4895060.0000002.92981636.3900520.7930980.6355020.0000000.0740701.5026701.4573141.2146000.0000000.1098052.7817191.2452301.2061950.0000000.2192202.6706451.4314671.3483170.0000000.2689033.0486871.9725631.4957610.0000000.2938193.7621432.3787441.6300800.0000000.3227914.3316153.1925862.0091860.0000000.4799815.6817533.4004291.7272740.0000000.4744085.6021113.0186231.5399640.0000000.4723825.0309691.0806760.6826270.0000000.2144371.977740 -
Production , sum wellbores
Production , sum wellbores MonthGross - oil
[mill Sm3]Gross - gas
[bill Sm3]Gross - condensate
[mill Sm3]Gross - oil equivalents
[mill Sm3]Sum22.93331214.2159410.00000037.1492530.8686010.6525570.0000001.5211581.5811701.2517330.0000002.8329031.4700941.2458600.0000002.7159541.6738041.3933190.0000003.0671232.1823061.5770220.0000003.7593282.7216031.7142330.0000004.4358363.7120842.1539880.0000005.8660723.9163941.8507170.0000005.7671113.5152191.6480100.0000005.1632291.2920370.7285020.0000002.020539 -
Production – charts
Production – charts Production – charts Production – charts Production – charts Production – charts Production – charts Any produced water is only included after 1.1.2000 -
Wellbores – exploration
Wellbores – exploration Wellbore nameEntered dateCompleted datePurposeStatusContent27.11.197406.07.1975WILDCATP&AGAS/CONDENSATE05.01.197909.08.1979APPRAISALP&AGAS/CONDENSATE26.04.200101.09.2001APPRAISALP&AOIL/GAS03.11.200511.04.2006APPRAISALP&AOIL/GAS19.05.201013.08.2010WILDCATP&AOIL/GAS -
Wellbores – development
Wellbores – development Wellbore nameEntered dateCompleted datePurposeContent06.09.202018.10.2021PRODUCTIONOIL/GAS26.05.202203.06.2022PRODUCTIONWATER09.09.202026.05.2021PRODUCTIONWATER17.11.201118.05.2014OBSERVATIONOIL27.06.201412.07.2014PRODUCTIONOIL21.10.201103.05.2014PRODUCTIONGAS/CONDENSATE13.11.201121.10.2014PRODUCTIONOIL16.11.201910.11.2020PRODUCTIONOIL28.10.201108.03.2013PRODUCTIONGAS12.05.202027.11.2021INJECTIONWATER16.05.202002.03.2021INJECTIONWATER15.10.201117.09.2012OBSERVATIONNOT APPLICABLE02.03.202212.04.2022PRODUCTIONOIL09.11.201101.01.2015PRODUCTIONOIL23.01.201514.06.2015PRODUCTIONOIL09.11.201911.03.2020PRODUCTIONOIL03.11.201130.07.2015PRODUCTIONGAS/CONDENSATE -
Wellbores – other
Wellbores – other Wellbore nameEntered dateCompleted datePurposeStatus20.10.200821.10.2008SOIL DRILLINGP&A22.10.200823.10.2008SOIL DRILLINGP&A24.10.200825.10.2008SOIL DRILLINGP&A28.10.200829.10.2008SOIL DRILLINGP&A01.11.200802.11.2008SOIL DRILLINGP&A15.08.201019.08.2010SHALLOW GASP&A