EDVARD GRIEG
Export:
PDF

-
General information
-
Picture
-
Discoveries included
Discoveries included Discovery name -
Activity status – history
Activity status – history StatusStatus fromStatus toProducing28.11.2015Approved for production11.06.201227.11.2015 -
Located in
Located in Block nameProd. licence16/1 -
Owner – current
Owner – current Owner kindOwner namePRODUCTION LICENSE -
Operatorship – current
Operatorship – current Company name -
Licensees – current
Licensees – current Company nameNation codeCompany share [%]NO65.000000NO20.000000NO15.000000 -
Description
Description TypeTextDate updatedDevelopmentEdvard Grieg is a field in the Utsira High area in the central North Sea, 35 kilometres south of the Grane and Balder fields. The water depth is 110 metres. Edvard Grieg was discovered in 2007, and the plan for development and operation (PDO) was approved in 2012. The field is developed with a fixed installation with a steel jacket and full process facility, and it utilises a jack-up rig for drilling and completion of wells. Production started in 2015. The Edvard Grieg installation supplies power to the Ivar Aasen field and processes the well stream from Ivar Aasen. Solveig and Rolvsnes are tied-back to Edvard Grieg.28.02.2023ReservoirEdvard Grieg produces undersaturated oil from alluvial, aeolian and shallow marine sandstone and conglomerate of Late Triassic to Early Cretaceous age. Reservoir quality varies from moderate to very good in marine and aeolian sandstone, while the quality is poorer in alluvial sandstone and conglomerate. Oil is also proven in the underlying basement. The reservoir is at a depth of 1,900 metres.28.02.2023Recovery strategyThe field is produced by pressure support from water injection.28.02.2023TransportThe oil is exported by pipeline to the Grane Oil Pipeline, which is connected to the Sture terminal. The gas is exported in a separate pipeline to the Scottish Area Gas Evacuation (SAGE) system in the UK.28.02.2023StatusThe field has been producing better than expected and recoverable volumes have increased significantly since the PDO due to excellent reservoir performance. Production is still in its plateau phase, and several new producers may come on stream in 2023. Test production from Rolvsnes started in 2021 and will continue in 2023.28.02.2023 -
Investments (expected)
Investments (expected) The operators future investments related to the reservers from 2022 [mill NOK 2022-kroner]. The stated investment estimate has not been corrected for possible investment sharing.2832 -
Investments (historical)
Investments (historical) Investments
[mill NOK nominal values]Sum28831202123252020818201916720181344201722862016230320155472201467562013590720121453 -
Production , saleable
Production , saleable MonthNet - oil
[mill Sm3]Net - gas
[bill Sm3]Net - condensate
[mill Sm3]Net - NGL
[mill Sm3]Net - oil equivalents
[mill Sm3]Sum38.0859873.4674550.0000001.91265543.4660972.6248240.2668890.0000000.1647013.0564145.1461060.4717340.0000000.2812585.8990985.6879280.4914030.0000000.2814576.4607885.0595690.4494910.0000000.2487015.7577614.9977390.4992250.0000000.2493195.7462835.1030520.4609190.0000000.2765085.8404795.4134690.4953350.0000000.2758156.1846193.9021510.3241450.0000000.1334454.3597410.1511490.0083140.0000000.0014510.160914 -
Production , sum wellbores
Production , sum wellbores MonthGross - oil
[mill Sm3]Gross - gas
[bill Sm3]Gross - condensate
[mill Sm3]Gross - oil equivalents
[mill Sm3]Sum38.3031144.4978460.00000042.8009602.6348980.3169580.0000002.9518565.2118150.6223260.0000005.8341415.7696080.6574710.0000006.4270795.1608200.5762190.0000005.7370395.0970590.6395300.0000005.7365895.0998240.6343410.0000005.7341655.4024500.5983340.0000006.0007843.7777230.4361920.0000004.2139150.1489170.0164750.0000000.165392 -
Production – charts
Production – charts Production – charts Production – charts Production – charts Production – charts Production – charts Any produced water is only included after 1.1.2000 -
Wellbores – exploration
Wellbores – exploration Wellbore nameEntered dateCompleted datePurposeStatusContent08.09.200713.11.2007WILDCATSUSPENDEDOILAPPRAISALWILL NEVER BE DRILLED02.10.200910.10.2009WILDCATP&AOIL13.11.200805.02.2009APPRAISALP&AOIL30.11.200921.01.2010APPRAISALP&AOIL22.01.201105.04.2011APPRAISALP&AOIL06.04.201113.05.2011APPRAISALP&AOIL24.02.201414.05.2014APPRAISALP&AOIL24.06.201525.08.2015APPRAISALP&AOIL01.03.201711.04.2017APPRAISALP&AOIL11.05.201922.06.2019APPRAISALP&AOIL10.03.201910.05.2019APPRAISALP&AOIL -
Wellbores – development
Wellbores – development Wellbore nameEntered dateCompleted datePurposeContent10.07.201605.09.2016INJECTIONWATER/GAS21.05.201511.06.2016INJECTIONWATER08.04.202302.08.2023PRODUCTIONOIL03.08.202331.08.2023PRODUCTIONOIL11.04.202302.06.2023PRODUCTIONOIL13.08.201715.12.2017INJECTIONWATER/GAS25.03.201510.05.2015PRODUCTIONOIL10.03.201719.05.2017PRODUCTIONOIL05.04.201828.05.2018OBSERVATIONNOT APPLICABLE01.06.201825.06.2018PRODUCTIONOIL02.12.201426.01.2015OBSERVATIONOIL16.12.201504.01.2016PRODUCTIONOIL02.10.201421.11.2014OBSERVATIONOIL01.02.201513.03.2015PRODUCTIONOIL05.05.202317.05.2023PRODUCTIONOIL01.10.201627.11.2016PRODUCTIONOIL20.08.201724.01.2018PRODUCTIONOIL04.02.202114.09.2021PRODUCTIONOIL06.12.201601.02.2017PRODUCTIONOIL12.02.202121.06.2021PRODUCTIONOIL22.06.202129.07.2021PRODUCTIONOIL19.02.202115.04.2021PRODUCTIONOIL04.02.201820.03.2018PRODUCTIONOIL02.06.201728.07.2017PRODUCTIONOIL04.09.201713.10.2017INJECTIONWATER -
Wellbores – other
Wellbores – other Wellbore nameEntered dateCompleted datePurposeStatus