MARIA
-
General information
-
Picture
-
Discoveries included
Discoveries included Discovery name -
Activity status – history
Activity status – history StatusStatus fromStatus toProducing16.12.2017Approved for production04.09.201515.12.2017 -
Located in
-
Owner – current
Owner – current Owner kindOwner namePRODUCTION LICENSE -
Operatorship – current
Operatorship – current Company name -
Licensees – current
Licensees – current Company nameNation codeCompany share [%]NO50.000000NO30.000000NO20.000000 -
Description
Description TypeTextDate updatedDevelopmentMaria is a field on Haltenbanken in the Norwegian Sea, 25 kilometres east of the Kristin field. The water depth is 300 metres. Maria was discovered in 2010, and the plan for development and production (PDO) was approved in 2015. The field is developed as a subsea tie-back with two templates. There are five producers and two water injectors on the field. Gas for gas lift is supplied from the Åsgard B facility via the Tyrihans D template. Sulphate-reduced water for injection is supplied from Heidrun. Production started in 2017.14.02.2020ReservoirMaria produces oil and gas from the Middle Jurassic Garn Formation. The formation is 90-100 metres thick and consists of massive sandstone with shale layers. The reservoir quality is best in the southern part of the deposit. The underlying Tilje and Ile Formations are aquiferous. The reservoir lies at a depth of 3,800 metres.25.04.2019RecoveryThe field is produced by water injection for pressure support. The wells are equipped with gas lift.16.03.2018TransportThe well stream is routed to the Kristin platform for processing and further export together with the gas and oil from the Kristin and Tyrihans fields. Stabilised oil is transported from Kristin to Åsgard C and further offloaded to shuttle tankers. The rich gas is sent via the Åsgard Transport System (ÅTS) to the Kårstø terminal, where NGL and condensate is extracted.16.03.2018StatusProduction has been lower than forecasted since start-up, due to limited reservoir communication and pressure support from the water injectors. Based on the production experience, total recovery from the field is expected to be lower than the PDO estimates. Work is ongoing to increase production, and drilling of more wells is being evaluated to increase recovery from the field.25.02.2020 -
Investments (expected)
Investments (expected) Future investments from 2021 [mill NOK 2021-kroner] : 1963 -
Investments (historical)
Investments (historical) Investments
[mill NOK nominal values]Sum140632020152620196252018773201751882016422420151700201427 -
Production , saleable
Production , saleable MonthNet - oil
[mill Sm3]Net - gas
[bill Sm3]Net - condensate
[mill Sm3]Net - NGL
[mill Sm3]Net - oil equivalents
[mill Sm3]Sum3.9005860.0157380.0000000.0093313.9256550.4122110.0157380.0000000.0093310.4372801.2027850.0000000.0000000.0000001.2027850.7939690.0000000.0000000.0000000.7939690.4396060.0000000.0000000.0000000.4396061.0520150.0000000.0000000.0000001.0520150.0000000.0000000.0000000.0000000.000000 -
Production , sum wellbores
Production , sum wellbores MonthGross - oil
[mill Sm3]Gross - gas
[bill Sm3]Gross - condensate
[mill Sm3]Gross - oil equivalents
[mill Sm3]Sum4.0434420.5491670.0000004.5926090.4176530.0645260.0000000.4821791.2069810.1696280.0000001.3766090.7828280.0973140.0000000.8801420.4314720.0551360.0000000.4866081.1360870.1537260.0000001.2898130.0684210.0088370.0000000.077258 -
Production – charts
Production – charts Production – charts Production – charts Production – charts Production – charts Production – charts Any produced water is only included after 1.1.2000 -
Wellbores – exploration
Wellbores – exploration Wellbore nameEntered dateCompleted datePurposeStatusContent16.05.201010.08.2010WILDCATP&AOIL31.01.201221.05.2012APPRAISALP&AOIL/GAS -
Wellbores – development
Wellbores – development Wellbore nameEntered dateCompleted datePurposeContent18.04.201726.10.2017INJECTIONWATER05.06.202028.07.2020PRODUCTIONOIL27.04.201716.05.2017INJECTIONWATER20.04.201725.12.2017PRODUCTIONOIL30.03.201730.08.2017PRODUCTIONOIL09.04.201705.02.2018PRODUCTIONOIL02.04.201718.09.2017INJECTIONWATER13.03.202017.05.2020INJECTIONWATER28.03.201718.07.2017PRODUCTIONOIL -
Wellbores – other
Wellbores – other Wellbore nameEntered dateCompleted datePurposeStatus