MUNIN
Export:
PDF

-
General information
-
Picture
-
Discoveries included
-
Activity status – history
Activity status – history StatusStatus fromStatus toApproved for production27.06.2023 -
Located in
-
Owner – current
Owner – current Owner kindOwner namePRODUCTION LICENSE -
Operatorship – current
Operatorship – current Company name -
Licensees – current
Licensees – current Company nameNation codeCompany share [%]NO50.000000NO50.000000 -
Description
Description TypeTextDate updatedDevelopmentMunin is located in in the Yggdrasil area in the central North Sea, 35 kilometres south of the Oseberg field. The water depth is 110 metres. The field comprises several discoveries and extends over 200 square kilometres. The first discovery was made in 1997 with well 30/11-5. Since then, a further ten discoveries have been made. The discovery wellbore for Munin is 30/11-8 S, drilled in 2011. The plan for development and operation (PDO) was approved in June 2023. The development concept includes subsea tie-back of the deposits to an unmanned processing platform located in the northern part of the Yggdrasil area. The PDO includes drilling of several untested structures which can be produced through available well slots or may trigger more subsea templates in the area. The platform will be tied-back to the Hugin A processing platform in the southern Yggdrasil area.23.08.2023ReservoirThe reservoirs contain gas and oil mainly in Middle Jurassic sandstone of the Brent Group at depths of 3,200-3,650 metres. The Munin area is geologically complex, and the deposits have varying reservoir and fluid properties.23.08.2023Recovery strategyThe deposits will be produced with different recovery strategies. The largest oil deposits will be produced with water injection, while gas deposits and smaller oil deposits will be produced by pressure depletion. Gas lift will also be utilised for oil deposits.23.08.2023TransportThe gas will be exported in a new pipeline from Hugin A via Statpipe to the Kårstø terminal. The oil will be transported to the Hugin A facility for further processing and transport.23.08.2023StatusThe field is under development. The development of Munin is coordinated with the development of the Hugin and Fulla fields in the Yggdrasil area. The production is planned to start in 2027.12.08.2023 -
Investments (expected)
Investments (expected) -
Investments (historical)
Investments (historical) Investments
[mill NOK nominal values]Sum -
Production , saleable
Production , saleable MonthNet - oil
[mill Sm3]Net - gas
[bill Sm3]Net - condensate
[mill Sm3]Net - NGL
[mill Sm3]Net - oil equivalents
[mill Sm3] -
Production , sum wellbores
Production , sum wellbores MonthGross - oil
[mill Sm3]Gross - gas
[bill Sm3]Gross - condensate
[mill Sm3]Gross - oil equivalents
[mill Sm3] -
Production – charts
Production – charts Production – charts Production – charts Production – charts Production – charts Production – charts Any produced water is only included after 1.1.2000 -
Wellbores – exploration
Wellbores – exploration Wellbore nameEntered dateCompleted datePurposeStatusContent05.12.199609.01.1997WILDCATP&AOIL20.05.201103.07.2011WILDCATP&AOIL/GAS/CONDENSATE20.03.201120.05.2011WILDCATP&AOIL/GAS/CONDENSATE14.11.201308.01.2014WILDCATP&AOIL22.09.201313.11.2013WILDCATP&AGAS01.11.201426.12.2014WILDCATP&AOIL/GAS/CONDENSATE28.12.201413.02.2015APPRAISALP&AOIL04.03.201619.03.2016WILDCATP&AOIL04.05.201620.05.2016APPRAISALP&ADRY08.04.201604.05.2016WILDCATP&AOIL22.05.201606.06.2016WILDCATP&AGAS/CONDENSATE07.06.201606.07.2016WILDCATP&AGAS/CONDENSATE06.07.201623.07.2016WILDCATP&AOIL/GAS/CONDENSATE -
Wellbores – development
Wellbores – development Wellbore nameEntered dateCompleted datePurposeContent -
Wellbores – other