-
General information
-
Picture
-
Discoveries included
Discoveries included Discovery name -
Activity status – history
Activity status – history StatusStatus fromStatus toProducing30.09.1990Approved for production26.06.198829.09.1990 -
Located in
Located in Block nameProd. licence2/11 -
Owner – current
Owner – current Owner kindOwner namePRODUCTION LICENSE -
Operatorship – current
Operatorship – current Company name -
Licensees – current
Licensees – current Company nameNation codeCompany share [%]NO90.000000NO10.000000 -
Description
Description TypeTextDate updatedStatusIn April 2022, production started from Hod B. The Hod Saddle area is being produced through wells drilled from the Valhall field. The original Hod platform awaits decommissioning within 2026.28.02.2023TransportOil and gas are transported in a shared pipeline to the Valhall field for further processing. Transport of oil and NGL from Valhall is routed via pipeline to the Ekofisk Centre and further to Teesside in the UK. Gas from Valhall is sent via Norpipe to Emden in Germany.28.02.2023Recovery strategyThe field is produced by pressure depletion. Gas lift has been used in some wells to increase production.28.02.2023DevelopmentHod is a field in the southern part of the Norwegian sector in the North Sea, about 13 kilometres south of the Valhall field. The water depth is 72 metres. Hod was discovered in 1974, and the plan for development and operation (PDO) was approved in 1988. The field was originally developed with an unmanned wellhead platform, remotely controlled from Valhall. Production started in 1990. A PDO for Hod Saddle was approved in 1994. Production from the original platform ceased in 2013. A PDO for the redevelopment of Hod with a new unmanned wellhead platform (Hod B) tied in to the Valhall field centre was approved in 2020.28.02.2023ReservoirHod produces oil from chalk in the Upper Cretaceous Tor and Hod Formations and the lower Paleocene Ekofisk Formation. The Tor Formation chalk is fine-grained and soft. Considerable fracturing allows oil and water to flow more easily than in the underlying Hod Formation. The reservoir depth is 2,700 metres. The field consists of three structures: Hod West, Hod East and Hod Saddle.28.02.2023 -
Investments (expected)
Investments (expected) The operators future investments related to the reservers from 2022 [mill NOK 2022-kroner]. The stated investment estimate has not been corrected for possible investment sharing.1847 -
Investments (historical)
Investments (historical) Investments
[mill NOK nominal values]Sum7185202133422020129520199201882017492016020150201412013140201288201115520109120091052008202007520062142005185200492003220022620019200014519992199842199731996119958419942911993519923199124219904411989163198811 -
Production , saleable
Production , saleable MonthNet - oil
[mill Sm3]Net - gas
[bill Sm3]Net - condensate
[mill Sm3]Net - NGL
[mill Sm3]Net - oil equivalents
[mill Sm3]Sum10.4277501.7243460.0000000.53900812.6911040.0859640.0074470.0000000.0028850.0962960.3635420.0351110.0000000.0162410.4148940.0294090.0030260.0000000.0008130.0332480.0417570.0046120.0000000.0012610.0476300.0398020.0054310.0000000.0012300.0464630.0532660.0044220.0000000.0015800.0592680.0715960.0067530.0000000.0020090.0803580.0774690.0077080.0000000.0022290.0874060.0684950.0053700.0000000.0017970.0756620.0692600.0064790.0000000.0020160.0777550.0355500.0041290.0000000.0012250.0409040.0444950.0036890.0000000.0013970.0495810.0700890.0075180.0000000.0026110.0802180.1733260.0170830.0000000.0068730.1972820.1937330.0272270.0000000.0090890.2300490.2167340.0331460.0000000.0103020.2601820.3022130.0468560.0000000.0136790.3627480.3759640.0475580.0000000.0154330.4389550.2314450.0354240.0000000.0099330.2768020.2817220.0506580.0000000.0133660.3457460.3296030.0418710.0000000.0143400.3858140.3719290.0509500.0000000.0148190.4376980.3767000.0427200.0000000.0150530.4344730.0942800.0109150.0000000.0034550.1086500.1307910.0166150.0000000.0050790.1524850.2935900.0542900.0000000.0150540.3629340.4676820.0946650.0000000.0264450.5887920.5604350.1197460.0000000.0322740.7124550.5236060.1176710.0000000.0323290.6736060.6163470.1388770.0000000.0382620.7934860.8681120.2037000.0000000.0511761.1229881.2875390.2497630.0000000.0766881.6139901.5261560.2021460.0000000.0876381.8159400.1551490.0207700.0000000.0104270.186346 -
Production , sum wellbores
Production , sum wellbores MonthGross - oil
[mill Sm3]Gross - gas
[bill Sm3]Gross - condensate
[mill Sm3]Gross - oil equivalents
[mill Sm3]Sum10.4738481.8620940.00000012.3359420.0688890.0000000.0000000.0688890.3886880.0062570.0000000.3949450.0286180.0036970.0000000.0323150.0405220.0056410.0000000.0461630.0384260.0050020.0000000.0434280.0512420.0065550.0000000.0577970.0688380.0082510.0000000.0770890.0745160.0093500.0000000.0838660.0782290.0077140.0000000.0859430.0791590.0089290.0000000.0880880.0338910.0050150.0000000.0389060.0394510.0059220.0000000.0453730.0717840.0165800.0000000.0883640.1768710.0464010.0000000.2232720.1936240.0599950.0000000.2536190.1870570.0508720.0000000.2379290.1826190.0396860.0000000.2223050.2757780.0467750.0000000.3225530.2113870.0428520.0000000.2542390.2712550.0608160.0000000.3320710.3163440.0659870.0000000.3823310.3622580.0595460.0000000.4218040.3831950.0518580.0000000.4350530.0904900.0118800.0000000.1023700.1357870.0179340.0000000.1537210.3104310.0571810.0000000.3676120.4929320.1024910.0000000.5954230.5901150.1290940.0000000.7192090.5534180.1266530.0000000.6800710.6525800.1479880.0000000.8005680.9120410.2123140.0000001.1243551.3512530.2052310.0000001.5564841.5973310.2152420.0000001.8125730.1648290.0223850.0000000.187214 -
Production – charts
Production – charts Production – charts Production – charts Production – charts Production – charts Production – charts Any produced water is only included after 1.1.2000 -
Wellbores – exploration
Wellbores – exploration Wellbore nameEntered dateCompleted datePurposeStatusContent06.11.197429.12.1974WILDCATP&AOIL10.10.197703.12.1977WILDCATP&AOIL SHOWS03.12.197713.03.1978APPRAISALP&AOIL18.05.197905.07.1979APPRAISALP&AOIL SHOWS02.09.198125.02.1982APPRAISALSUSPENDEDOIL19.07.199013.08.1990APPRAISALRE-CLASS TO DEVOIL28.02.199414.06.1994WILDCATRE-CLASS TO DEVOIL10.01.201912.02.2019APPRAISALP&ADRY -
Wellbores – development
Wellbores – development Wellbore nameEntered dateCompleted datePurposeContent07.01.199105.03.1991PRODUCTIONOIL06.03.199103.04.1991PRODUCTIONOIL12.07.199424.07.1994PRODUCTIONOIL01.10.199030.11.1990PRODUCTIONOIL13.04.199114.05.1991OBSERVATIONOIL15.05.199124.05.1991PRODUCTIONOIL04.07.199027.08.1991PRODUCTIONOIL28.02.199414.06.1994PRODUCTIONOIL03.08.199402.09.1994PRODUCTIONOIL13.08.199022.09.1990PRODUCTIONOIL28.04.199412.06.1994OBSERVATIONNOT APPLICABLE14.06.199421.06.1994PRODUCTIONOIL27.09.199525.10.1995OBSERVATIONNOT APPLICABLE27.10.199505.11.1995PRODUCTIONOILPRODUCTION05.01.202210.02.2022PRODUCTIONOIL12.12.202124.12.2021PRODUCTIONOILPRODUCTION25.09.202114.10.2021OBSERVATIONNOT APPLICABLE16.10.202126.10.2021PRODUCTIONOIL31.10.202116.11.2021PRODUCTIONOILPRODUCTION20.11.202104.12.2021PRODUCTIONOIL19.01.202204.03.2022PRODUCTIONOIL05.03.202212.03.2022PRODUCTIONOILPRODUCTIONPRODUCTIONPRODUCTION06.11.200504.12.2005PRODUCTIONOIL13.12.200517.01.2006PRODUCTIONOIL18.01.200617.02.2006PRODUCTIONOIL05.05.200507.06.2005PRODUCTIONOIL -
Wellbores – other
Wellbores – other Wellbore nameEntered dateCompleted datePurposeStatus09.06.201209.06.2012SOIL DRILLINGP&A14.06.201214.06.2012SOIL DRILLINGP&A14.06.201215.06.2012SOIL DRILLINGP&A11.06.201212.06.2012SOIL DRILLINGP&A11.06.201211.06.2012SOIL DRILLINGP&A09.06.201211.06.2012SOIL DRILLINGP&A07.06.201209.06.2012SOIL DRILLINGP&A12.06.201214.06.2012SOIL DRILLINGP&A12.06.201212.06.2012SOIL DRILLINGP&A14.06.201214.06.2012SOIL DRILLINGP&A14.06.201214.06.2012SOIL DRILLINGP&A07.06.201207.06.2012SOIL DRILLINGP&A07.06.201207.06.2012SOIL DRILLINGP&A01.09.202001.09.2020SHALLOW GASPLUGGED