GOLIAT
-
General information
-
Picture
-
Discoveries included
Discoveries included Discovery name -
Activity status – history
Activity status – history StatusStatus fromStatus toProducing12.03.2016Approved for production18.06.200911.03.2016 -
Located in
-
Owner – current
Owner – current Owner kindOwner namePRODUCTION LICENSE -
Operatorship – current
Operatorship – current Company name -
Licensees – current
Licensees – current Company nameNation codeCompany share [%]NO65.000000NO35.000000 -
Description
Description TypeTextDate updatedDevelopmentGoliat is a field in the Barents Sea, 50 kilometres southeast of the Snøhvit field. The water depth is 360-420 metres. Goliat was discovered in 2000, and the plan for development and operation (PDO) was approved in 2009. The field is developed with a cylindrical floating production, storage and offloading facility (Sevan 1000 FPSO). Eight subsea templates with a total of 32 well slots are tied-back to the FPSO. Production started in 2016. Goliat was granted a PDO exemption for the Snadd reservoir in 2017 and production started the same year.13.02.2020ReservoirGoliat produces oil from sandstone of Triassic age in the Kobbe and Snadd Formations, and in the Kapp Toscana Group (Realgrunnen subgroup) of Triassic to Jurassic age. The reservoirs have thin gas caps and lie in a complex and segmented structure at depths of 1,100-1,800 metres.13.02.2020RecoveryThe field is produced using water injection as pressure support. Additional pressure support results from reinjection of produced gas.13.02.2020TransportThe oil is offloaded to shuttle tankers for transport to the market. Future gas export is pending an export solution.25.04.2019StatusProduction regularity has been below expectation since production start-up. Continuous maintenance and modification work along with several revision stops have resulted in a gradually improved regularity of the facility. In 2018, production from two new infill wells started. Drilling of the Goliat Vest prospect in 2018 resulted in additional resources. More infill wells and exploration wells are planned.25.02.2020 -
Investments (expected)
Investments (expected) Future investments from 2020 [mill NOK 2020-kroner] : 2897 -
Investments (historical)
Investments (historical) Investments
[mill NOK nominal values]Sum5115220195352018141220171520201633852015989420149389201366992012813620116683201027442009755 -
Production , saleable
Production , saleable MonthNet - oil
[mill Sm3]Net - gas
[bill Sm3]Net - condensate
[mill Sm3]Net - NGL
[mill Sm3]Net - oil equivalents
[mill Sm3]Sum13.6873720.0000000.0000000.00000013.6873722.1453040.0000000.0000000.0000002.1453042.3586940.0000000.0000000.0000002.3586943.7202830.0000000.0000000.0000003.7202832.5129650.0000000.0000000.0000002.5129652.9501260.0000000.0000000.0000002.950126 -
Production , sum wellbores
Production , sum wellbores MonthGross - oil
[mill Sm3]Gross - gas
[bill Sm3]Gross - condensate
[mill Sm3]Gross - oil equivalents
[mill Sm3]Sum13.6873724.1321190.00000017.8194912.1453041.2086330.0000003.3539372.3586940.9160670.0000003.2747613.7202831.0190140.0000004.7392972.5129650.4564560.0000002.9694212.9501260.5319490.0000003.482075 -
Production – charts
Production – charts Production – charts Production – charts Production – charts Production – charts Production – charts Any produced water is only included after 1.1.2000 -
Wellbores – exploration
Wellbores – exploration Wellbore nameEntered dateCompleted datePurposeStatusContent16.09.200005.10.2000WILDCATP&AOIL12.09.200119.10.2001APPRAISALP&AOIL24.10.200508.01.2006WILDCATP&AOIL/GAS21.09.200625.11.2006WILDCATP&AOIL/GAS23.12.200613.01.2007APPRAISALP&AOIL21.10.201204.01.2013APPRAISALP&AOIL/GAS28.11.201826.12.2018APPRAISALP&AOIL/GAS -
Wellbores – development
Wellbores – development Wellbore nameEntered dateCompleted datePurposeContent10.08.201528.08.2015PRODUCTIONOIL13.06.201520.07.2015PRODUCTIONOIL11.06.201530.06.2015PRODUCTIONOIL08.08.201506.10.2015PRODUCTIONOIL07.10.201515.10.2015PRODUCTIONOIL23.06.201707.07.2017OBSERVATIONNOT APPLICABLE08.07.201714.07.2017PRODUCTIONOIL26.12.202004.01.2021PRODUCTIONOIL30.04.201822.05.2018PRODUCTIONOILPRODUCTION05.12.201523.01.2016PRODUCTIONOIL24.01.201629.01.2016PRODUCTIONOIL01.12.201523.12.2015PRODUCTIONOIL11.05.201414.11.2014PRODUCTIONOIL31.05.201427.10.2014PRODUCTIONOIL05.04.201407.05.2014PRODUCTIONOIL22.11.201430.11.2014PRODUCTIONOIL06.04.201617.04.2016INJECTIONWATER04.07.201416.01.2015INJECTIONGAS02.08.201428.09.2014INJECTIONGASINJECTION15.02.201607.03.2016INJECTIONWATER12.02.201628.02.2016INJECTIONWATER19.01.201305.03.2013OBSERVATIONWATER26.05.201310.06.2013INJECTIONWATER28.07.201713.08.2017INJECTIONWATER30.01.201329.03.2013INJECTIONWATER26.01.201312.05.2013INJECTIONWATER30.04.201627.05.2016PRODUCTIONOIL16.02.201509.05.2015PRODUCTIONOIL18.02.201529.03.2015PRODUCTIONOIL09.06.201807.07.2018PRODUCTIONOIL08.02.201416.03.2014INJECTIONGAS28.03.201721.04.2017INJECTIONWATER -
Wellbores – other
Wellbores – other Wellbore nameEntered dateCompleted datePurposeStatus13.06.201015.06.2010STRATIGRAPHICP&A11.06.201013.06.2010STRATIGRAPHICP&A15.06.201017.06.2010STRATIGRAPHICP&A17.06.201018.06.2010STRATIGRAPHICP&A19.10.201221.10.2012SHALLOW GASP&A18.06.201321.06.2013SHALLOW GASP&A18.06.201020.06.2010SOIL DRILLINGP&A